Project Initiation & Planning

1. Project Kickoff & Stakeholder Alignment
  • Conduct stakeholder workshops to define objectives, scope, and success criteria
  • Identify key roles & responsibilities (RACI matrix)
  • Establish communication protocols and reporting structures
2. Scope Definition & Work Breakdown
  • Develop detailed project charter with deliverables
  • Create Work Breakdown Structure (WBS)
  • Define milestones and critical path
3. Schedule & Resource Planning
  • Build baseline project schedule (Gantt/P6/MS Project)
  • Allocate human/resources/budget requirements
  • Optimize resource leveling to prevent bottlenecks
4. Risk & Compliance Framework
  • Conduct risk identification workshops
  • Develop risk register with mitigation strategies
  • Ensure regulatory/compliance alignment
5. Approval & Governance Setup
  • Prepare project initiation document (PID) for sponsor sign-off
  • Establish change control processes
  • Implement project tracking dashboards

Design & Pre-Construction Management

1. Design Development & Coordination
  • Conduct stakeholder workshops to finalize design requirements
  • Prepare conceptual/schematic designs (architectural, structural, MEP)
  • Coordinate multi-disciplinary design teams (architects, engineers, specialists)
  • Ensure compliance with local codes, zoning laws, and sustainability standards
2. Design Documentation & Review
  • Develop detailed construction drawings (CAD/BIM models)
  • Review design deliverables for accuracy, constructability, and value engineering
  • Manage design revisions based on client/authority feedback
  • Prepare tender/construction-ready documents
3. Permitting & Regulatory Approvals
  • Identify required permits and approvals (building, environmental, utility)
  • Liaise with authorities (municipalities, fire departments, DISCOs)
  • Track approval timelines and resolve compliance issues
4. Contractor Prequalification & Tendering
  • Prepare technical specifications and BOQ
  • Shortlist qualified contractors/vendors
  • Manage bid process, evaluations, and negotiations
  • Recommend award strategies
5. Pre-Construction Planning
  • Finalize project schedules, budgets, and procurement plans
  • Conduct constructability reviews and risk workshops
  • Establish quality/safety protocols
  • Develop stakeholder handover plans

Construction Execution Management

1. Construction Planning & Mobilization
  • Finalize baseline schedules, budgets, and resource plans
  • Oversee site mobilization (logistics, temporary facilities, permits)
  • Conduct pre-construction meetings with contractors and stakeholders
  • Implement digital project management tools (BIM, ERP, drones)
2. On-Site Supervision & Quality Control
  • Monitor daily progress vs. schedule (Gantt/P6 updates)
  • Enforce QA/QC protocols (material testing, workmanship standards)
  • Conduct regular site inspections (safety, compliance, productivity)
  • Manage non-conformance reports (NCRs) and corrective actions
3. Contractor & Subcontractor Coordination

 

  • Chair weekly coordination meetings (RFIs, change orders, delays)
  • Track subcontractor performance (timeliness, quality, safety)
  • Resolve disputes and claims through documented processes
  • Ensure adherence to contractual obligations

.

4. Cost & Change Management
  • Monitor actual vs. budgeted costs (labor, materials, equipment)
  • Evaluate change order requests (impact on time/cost/scope)
  • Approve progress payments against milestones
  • Optimize resource allocation to prevent overruns
5. Safety & Compliance Oversight
  • Enforce OSHA/local safety regulations (PPE, permits, training)
  • Conduct emergency drills and safety audits
  • Ensure environmental compliance (waste disposal, emissions)
  • Maintain statutory inspection records
6. Reporting & Stakeholder Communication
  • Issue daily/weekly/monthly progress reports
  • Update real-time dashboards (KPIs, risks, issues)
  • Present executive summaries to clients/investors
  • Document lessons learned for continuous improvement

Vendor & Contract Management

1. Vendor Pre-Qualification & Selection
  • Develop vendor evaluation criteria (technical, financial, compliance)
  • Conduct market research to identify potential suppliers/contractors
  • Manage RFQ/RFP processes (bid documentation, timelines, clarifications)
  • Perform due diligence (background checks, site visits, reference validation)
2. Contract Development & Negotiation
  • Draft contract terms & conditions (scope, deliverables, SLAs, penalties)
  • Negotiate pricing, payment terms, and warranties
  • Define KPIs and performance metrics for vendor accountability
  • Ensure regulatory and legal compliance (tax, labor, safety laws)
3. Contract Execution & Monitoring
  • Maintain centralized contract repository with key dates and obligations
  • Track vendor performance (quality, timelines, cost adherence)
  • Conduct regular review meetings (progress, issues, improvements)
  • Manage change orders and amendments
4. Risk & Dispute Management
  • Identify contractual risks (delays, cost overruns, non-compliance)
  • Implement mitigation strategies (penalties, liquidated damages)
  • Resolve disputes/claims through mediation or arbitration
  • Enforce exit/clause strategies for underperforming vendors
5. Relationship & Performance Optimization
  • Develop vendor scorecards (quarterly/annual evaluations)
  • Facilitate collaboration workshops for continuous improvement
  • Recommend strategic partnerships for long-term cost savings
  • Conduct contract closeout reviews (lessons learned, feedback)

Technology & Innovation Integration BIM
(Building Information Modeling)

1. BIM Strategy & Implementation Planning
  • Conduct BIM maturity assessment & gap analysis
  • Develop BIM execution plan (BEP) aligned with project goals
  • Define LOD (Level of Detail) requirements for each phase
  • Establish collaboration protocols for stakeholders
2. BIM Model Development & Coordination
  • Create 3D parametric models (Architectural, Structural, MEP)
  • Conduct clash detection and resolution (Navisworks, Revizto)
  • Generate 4D (time) & 5D (cost) simulations
  • Integrate GIS, IoT, and facility management data
3. Digital Collaboration & Workflow Optimization

 

  • Implement Common Data Environment (CDE) for centralized access
  • Set up BIM 360/ACC platforms for real-time collaboration
  • Train teams on model-based workflows
  • Automate QA/QC checks using AI/ML tools
4. Innovation Integration
  • Deploy AR/VR for design reviews & client presentations
  • Enable digital twin for asset lifecycle management
  • Integrate scan-to-BIM for as-built verification
  • Pilot generative design & AI-driven optimization
5. Performance Monitoring & ROI Analysis
  • Track BIM adoption metrics (RFIs reduced, clash savings)
  • Calculate time/cost benefits vs. traditional methods
  • Provide innovation roadmaps for future projects
  • Conduct post-implementation reviews

Project Closeout & Handover

1. Closeout Planning & Documentation Review
  • Develop closeout checklist aligned with contract requirements
  • Verify as-built drawings against final construction
  • Compile O&M manuals, warranties, and guarantees
  • Confirm regulatory compliance certificates (safety, environmental)
2. Defect & Punch List Management
  • Conduct final inspections with contractors and clients
  • Document outstanding works and defects
  • Track punch list completion with responsible parties
  • Verify corrective actions before handover
3. Financial & Contractual Closure
  • Reconcile final accounts (retentions, variations, claims)
  • Obtain lien waivers and release of securities
  • Close subcontractor and supplier contracts
  • Archive project financial records
4. Asset & System Handover
  • Transfer digital models (BIM) and asset data
  • Conduct training sessions for facility teams
  • Hand over keys, access controls, and spare parts
  • Provide emergency contact lists and escalation protocols
5. Lessons Learned & Performance Evaluation
  • Facilitate closeout workshops with stakeholders
  • Document successes, challenges, and improvement areas
  • Prepare final project performance report (time, cost, quality)
  • Recommend process optimizations for future projects

Post-Construction Support

1. Project Overview:
  • Provide expert post-construction consultancy services to ensure smooth project closeout and operational readiness.
  • Assist the client with inspections, quality assurance, system commissioning, documentation management, warranty coordination, training, and handover processes.
  • Ensure that the project is fully compliant with construction specifications, contractual requirements, regulatory standards, and operational needs.
  • Support the client in achieving a seamless transition from construction phase to occupancy and building operation phase.

     

2. Objectives:
  • Facilitate a smooth handover of the project from construction to full operational status.
  • Verify that all construction activities are completed according to design, quality, and regulatory standards.
  • Ensure that all outstanding punch list items and warranty obligations are properly documented and addressed.
  • Support the client’s facilities management and operations teams through detailed system training and documentation review.
  • Minimize early-stage operational risks, maintenance issues, and defects through quality verification and early troubleshooting.
  • Strengthen the client’s ability to manage their asset effectively with proper documentation, training, and post-occupancy support.
3. Scope of Services:
  • Final Site Inspections and Quality Assurance Review:
    • Conduct comprehensive final inspections of all completed construction work.
    • Identify any incomplete works, defects, or quality concerns.
  • Development and Management of Punch Lists:
    • Create detailed punch lists based on inspections.
    • Monitor and track the closure of all punch list items with contractors.
  • Coordination of Deficiency Rectification:
    • Facilitate communication between client and contractors/subcontractors to ensure timely resolution of deficiencies.
  • Review and Handover of As-Built Drawings, Manuals, and Warranties:
    • Collect, review, and organize as-built drawings, operation and maintenance (O&M) manuals, and warranty documents.
    • Ensure completeness and accuracy of handover packages.
  • Building Systems Testing, Commissioning, and Performance Verification:
    • Oversee and verify testing, commissioning, and performance of all building systems (e.g., HVAC, electrical, plumbing).
  • Training Sessions for Client’s Facilities Management Teams:
    • Conduct detailed operational training for facilities staff covering systems operation, emergency procedures, and routine maintenance.
  • Warranty Management and Warranty Claims Support:
    • Track warranties and support the client in filing and managing warranty claims.
  • Post-Occupancy Evaluations and Feedback Surveys:
    • Conduct post-occupancy walkthroughs to gather feedback and assess building performance.
    • Recommend adjustments based on early operational issues.
  • Support for Regulatory Compliance Inspections:
    • Assist with preparation and documentation for any final inspections by regulatory bodies.
  • Recommendations for Facility Maintenance Plans:
  •    Provide preventive maintenance recommendations for all major systems and equipment.
4. Deliverables:
  • Final Inspection Reports with identified issues and recommended actions.
  • Complete and verified Punch List Reports with rectification tracking.
  • Full As-Built Documentation Package, including:
    • As-Built Drawings
    • O&M Manuals
    • Equipment Warranties
  • Training Manuals and Records of Facility Management Training Sessions.
  • Warranty Tracking Logs and Claim Support Documentation.
  • Post-Occupancy Evaluation Reports including feedback analysis and action plans.
  • Preventive Maintenance Plan Recommendations.
5. Timeline:
  • Project Kick-off and Initial Review: Week 0
  • Site Inspections and Punch List Preparation: Weeks 1–2
  • Coordination of Deficiency Rectification and Warranty Management: Weeks 3–4
  • Client Staff Training and Documentation Handover: Week 5
  • Post-Occupancy Support and Final Evaluations: Weeks 6–8

Site Logistic & Construction Scheduling

1. Site Layout and Logistics Planning:
  • Design detailed site layout plans showing material storage, equipment zones, worker facilities, and access points.
  • Plan efficient routes for vehicle movement, delivery management, and pedestrian access.
  • Allocate space for temporary site offices, washrooms, security cabins, and first-aid units.
  • Define emergency evacuation routes and fire-fighting equipment locations.
  • Manage hoardings, signage, fencing, and site security arrangements.
2. Construction Activity Scheduling:
  • Develop a comprehensive construction schedule using project management tools (Primavera, MS Project).
  • Identify project milestones, activity dependencies, and resource allocation.
  • Determine critical path activities to prioritize essential works.
  • Create phase-wise work breakdown structure (WBS) to organize tasks.
  • Update schedules periodically based on site progress and changes.
3. Material and Resource Coordination:
  • Plan and coordinate the timely delivery of construction materials and equipment.
  • Schedule unloading zones, storage methods, and material handling strategies.
  • Align workforce mobilization with construction activities.
  • Manage vendor schedules to avoid site congestion and delays.
  • Monitor inventory levels and forecast material requirements.
4. Risk Management and Site Safety:
  • Identify and mitigate risks related to logistics, site access, and construction activities.
  • Integrate health, safety, and environmental (HSE) compliance into logistics and scheduling.
  • Develop contingency plans for weather delays, delivery issues, and site emergencies.
  • Conduct regular safety audits and inspections related to logistics management.
  • Implement corrective actions for non-compliance or site disruptions.
5. Monitoring, Reporting, and Adjustments:
  • Track site logistics performance and construction progress regularly.
  • Prepare periodic reports highlighting scheduling updates and logistic adjustments.
  • Conduct site meetings with contractors and stakeholders to review progress.
  • Recommend adjustments in site layout or activity sequencing as needed.
  • Support in closing logistics facilities during demobilization and project closeout.

Quality Assurance & Quality Control (QA/QC) Programs

1. Development of QA/QC Plans:
  • Create a comprehensive Quality Assurance and Quality Control program tailored to project requirements.
  • Define quality objectives, standards, and project-specific benchmarks.
  • Establish roles and responsibilities for QA/QC management across all teams.
  • Develop Inspection and Test Plans (ITPs) for major construction activities.
  • Ensure alignment of QA/QC plans with industry standards (ISO, ASTM, project specs).
2. Quality Assurance Implementation:
  • Conduct pre-construction QA meetings with client, contractors, and vendors.
  • Review and approve project materials, equipment, and construction methodologies.
  • Implement document control systems to track submittals, approvals, and revisions.
  • Perform regular audits on contractor quality systems and processes.
  • Establish preventive measures to avoid quality issues before they occur.
3. Quality Control Activities:
  • Perform routine field inspections, testing, and verification during construction.
  • Monitor workmanship, materials, and installation methods against approved standards.
  • Coordinate third-party testing agencies for specialized quality tests.
  • Issue Non-Conformance Reports (NCRs) and ensure timely corrective actions.
  • Maintain detailed inspection reports, photographic records, and test certificates.
4. Risk Mitigation and Compliance Monitoring:
  • Identify potential quality risks and implement mitigation strategies early.
  • Verify compliance with local building codes, regulations, and client specifications.
  • Conduct root-cause analysis for recurring quality issues and recommend solutions.
  • Implement continuous improvement measures throughout the project lifecycle.
  • Support regulatory inspections and certifications as required.
5. Reporting, Handover, and Training:
  • Prepare Weekly and Monthly QA/QC Progress Reports.
  • Compile final Quality Documentation including inspection records and testing results.
  • Assist with punch list development, tracking, and closure verification.
  • Deliver QA/QC training sessions for contractors and client teams.
  • Support the final handover process by ensuring all quality requirements are met